In 7.4.4.2 Temperature maintenance controls recirculating hot-water systems shall be equipped with automtatic time switches or other controls that can be set to switch off the usage temperature maintenance system during extended periods when hot water is not required. How shall I interpret extended period? It there any definition? Is a weekend an extended period? The school holidays? If we in our retail project doesn´t have an extended perdiods do we stil need do install the control system?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.