Forum quick links
Online Template Issue - Upload Time Required for IEQp1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Shannon Allison on
I have a technical question about LEED Online and inputting information into the Adobe Form for IEQp1.
RE: IEQ.p1- 62 MZ-ASHRAE Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bobby Ghataura on
I have a 3 story non-residential building, and VAV's on each floor are served by individual air handling units.
Supplementary ventilation for after-hours
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Nezamutinova on
Our project has one primary ventilation system for the entire project space served by the base building AHUs.
Supplementary mechanical ventilation in naturally ventilated
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Smithing on
Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.
VRP Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
We have a central Air Handling Unit supplying 100% outside fresh air to all the rooms in a building, e.g offices, meeting rooms, conference rooms, etc This air will be tempered to say 18 degrees Ce
Warehouse
CI-2009 IEQp1:Minimum IAQ Performanceposted by Anke Koch on
Dear LEED community, we are working on a project in Berlin, Germany.
IAQ calculator v03
CI-2009 IEQp1:Minimum IAQ Performanceposted by Izabela Kwiecinska on
The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w
IEQp1 VRP Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Vassil Vassilev on
Greetings, Regarding IEQp1 and VRP Compliance Calculator there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
LEED 2009 CI Preliminary Combined Review
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hello, I am new to LEED and need some assistance before issuing for preliminary combined review. I have completed all the required project and pre-requisites forms.
AHUs not within tenant space
CI-2009 IEQp1:Minimum IAQ Performanceposted by Mike D on
If the AHUs are not located within the tenant space, do we still have to include information about it?