IAQ Procedure is NOT acceptable?

CI-2009 IEQp1:Minimum IAQ Performance
posted by  James Keohane  on 

I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.

1
Tue Jan 24, 2017, 2:21 pm

Technical Rooms

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Juliana Malho  on 

Does technical rooms, as IDFs rooms needs to have outside air renovation?

1
Fri Aug 31, 2012, 5:55 pm

outdoor air rate for kitchens

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Adam Targowski  on 

I would like to ask if there's any requirement regarding outdoor air suplly to a kitchen located in an office area? In ASHRAE 62.1-2007 Table 6-1 a kitchen is not mentioned.

1
Fri Dec 21, 2012, 7:57 pm

Mech. exhaust fan required for a naturally ventilated project?

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Ron Dean  on 

I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.

1
Tue Aug 26, 2014, 7:36 pm

Base building system

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Graham Langton  on 

Hi, To what extent does the base building system need to be entered into the VRP calculator?My CI project spaces is carried out space by space but that level of detail for other tenants isn't ava

0

Warehouse

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Anke Koch  on 

Dear LEED community, we are working on a project in Berlin, Germany.

2
Mon Aug 7, 2017, 1:28 am

IAQ calculator v03

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

4
Mon May 8, 2017, 7:51 am

IEQp1 VRP Calculator

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Vassil Vassilev  on 

Greetings, Regarding IEQp1 and VRP Compliance Calculator there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Jan 6, 2016, 6:12 am

LEED 2009 CI Preliminary Combined Review

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Aparna Maladkar  on 

Hello, I am new to LEED and need some assistance before issuing for preliminary combined review. I have completed all the required project and pre-requisites forms.

2
Default Avatar
LEEDuser Basic Member
45 thumbs up
Thu Dec 18, 2014, 4:41 pm

AHUs not within tenant space

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Mike D  on 

If the AHUs are not located within the tenant space, do we still have to include information about it?

2
Director of Sustainability
IPS-Integrated Project Services
LEEDuser Basic Member
6 thumbs up
Fri Jul 18, 2014, 1:21 am