Forum quick links
Online Template Issue - Upload Time Required for IEQp1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Shannon Allison on
I have a technical question about LEED Online and inputting information into the Adobe Form for IEQp1.
RE: IEQ.p1- 62 MZ-ASHRAE Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bobby Ghataura on
I have a 3 story non-residential building, and VAV's on each floor are served by individual air handling units.
Supplementary ventilation for after-hours
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Nezamutinova on
Our project has one primary ventilation system for the entire project space served by the base building AHUs.
Supplementary mechanical ventilation in naturally ventilated
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Smithing on
Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.
VRP Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
We have a central Air Handling Unit supplying 100% outside fresh air to all the rooms in a building, e.g offices, meeting rooms, conference rooms, etc This air will be tempered to say 18 degrees Ce
Min Airflow in Intermittent Occupancy Spaces
CI-2009 IEQp1:Minimum IAQ Performanceposted by Rick Servoss on
We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30 cubic feet
Ventilation of a Backup Diesel Generator Closet
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wironen on
We have a small mechanical equipment room that contains a backup diesel generator. It is being ventilated to remove exhaust and excess heat.
IEQp1 LEED Online form what to input?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
For ASHRAE 62.1 do I upload forms for the Baseline of meeting ASHRAE 62.1 and not my forms for IEQc2 Increased Ventilation? Table IEQp1-3.
Ventilation design-worst case conditions
CI-2009 IEQp1:Minimum IAQ Performanceposted by S Nagarajan on
How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed