"Determination of Ds Value for worst case scenario"
CI-2009 IEQp1:Minimum IAQ Performanceposted by Cyriac Joseph on
How do we calculate the Ds value for the condition where "The cooling load is low due to minimal envelope and internal loads but the number of occupants are at peak?" We have the following comment
Need help, using new v2009v4_Minimum IAQ Calculator_v03
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
After adding all the values for four floors I'm working on, I then input the design OA intake flow for each floor's AHU. In the summary tab, 3 out of 4 of the Zone systems meet the required OA int
IEQp1 ASHRAE Section 4 through 7
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Hill on
We are working on a office interior design project.
Renovated spaces or whole building for ASHRAE 62.1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Matt Humphreys on
Hello, We have a project that consists of renovating 3 separate spaces in a large commercial building.
IEQp1: Minimum Indoor Air Quality Performance
CI-2009 IEQp1:Minimum IAQ Performanceposted by Arslan Faisal on
We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents.
Single Zone served by 2 HVAC systems
CI-2009 IEQp1:Minimum IAQ Performanceposted by Nandana Kumar on
Hi, In our project, a particular zone (Board Room) is being served by 2 systems: central chiller plant through an AHU & by Cassette Units.
IEQp1 Design Review told me I have multizone not single
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
I have roof top units. Each serves several rooms. One system serves a single room with single thermostat.
Transfer Air for IEQp1 achievement
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
Hello, I'm currently working on a project of a huge supermarket. The building has warehouses and storage rooms.
IEQp1 Compliance ?
CI-2009 IEQp1:Minimum IAQ Performanceposted by George Bender on
Office floor of a high rise building trying to obtain LEED sliver. Floor is served by AHU, which serves 30 other floors not in scope. VAV's serve multiple zones on this floor.