Forum quick links
Alternative Compliance Path for Projects outside the US
CI-2009 IEQc2:Increased Ventlilationposted by Marco Abdallah on
Hi, can we use the "Alternative Compliance Path for Projects outside the US" which has been launched for New Construction and Major Renovations for a CI Project? The credit content & requiremen
Increase Ventilation - Corridor
CI-2009 IEQc2:Increased Ventlilationposted by Simon Sue on
Hi, we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor.
ventilation flow rate
CI-2009 IEQc2:Increased Ventlilationposted by ilkyaz ceren güçlü on
Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?
LEED 2009 ID+C Study Guide Typo? IEQ C2
CI-2009 IEQc2:Increased Ventlilationposted by Elizabeth Ingram on
Hi! The above lists IEQ C2 as 5 points. Am I misunderstanding this? Is it another strange and wondrous EP or ID credit, or suite of credits?
Non-US Projects
CI-2009 IEQc2:Increased Ventlilationposted by Phillip Cook on
It says that projects outside the US may use a local equivalent.