Post a question or comment
Credit Filters
Outdoor Air Delivery Monitoring
Filter by location
Forum
Topic
Replies
Recent
1
Tue Jun 7, 2022, 12:02 am

Non-Densely Occupied Spaces Served by Existing AHU

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Michelle Ruda  on 

If you have non-densely occupied spaces served by an existing AHU, how should the outdoor airflow measurement be handled?

1
Thu Sep 22, 2011, 3:20 pm

Non-densely occupied spaces without airflow measurement device

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Mike D  on 

Do all the spaces come into account for this credit?

1
Mon Jul 1, 2013, 5:51 pm

Demand Control Ventilation

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Dylan Connelly  on 

I have a small TI project with 14 small rooms (

1
Mon Nov 21, 2011, 4:20 pm

100% OA VAVs

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Jeremy Kuhre  on 

We are remodeling two floors of a high-rise office tower. A 100% OA VAV introduces OA into the mechanical room for each floor where it is mixed with return air.

1
Mon Jun 3, 2013, 7:17 pm

CO2 Monitors in Waiting Room Without 4 Walls

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Michelle Halle Stern  on 

I'm working on a HC interiors project with waiting rooms and nurse stations that have density of 25 people/1000sf, however they do not have 4 walls enclosing the spaces.

1
Tue Sep 8, 2015, 3:29 pm

Automated control

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Max Calabro  on 

I notice the credit language here requires an alarm when CO2 levels are more than 10% above desired.

1
Mon Nov 21, 2011, 4:29 am

Too many densely occupied spaces

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Rubén M. R.  on 

Hello everyone, I am working on a three-level commercial office project.

1
Wed Dec 12, 2012, 1:30 am

Alternative to OA airflow measurement device at Building AHU

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Kristopher Baker   on 

So like many on this thread, i have a LEED CI project that is 1/3 of 1 floor and is served by the base building AHU that is outside the scope and LEED boundary of the project.

1
Tue Sep 8, 2015, 3:36 pm
1
Tue Dec 28, 2010, 11:12 pm