Forum quick links
IEQc2 - Why haven't we been awarded the credit?
NC-2009 IEQc2:Increased Ventilationposted by Mairead Morrissey on
Hi, We have an overall 30% ventilation above ASHRAE, for each individual space.
ID credit for Green Education- Signage change
NC-2009 IDc1:Innovation in Designposted by Valerie Molinski on
I have achieved an ID credit for my client in the past, based on fulfilling two of the three requirements of the CIR.
IEQ 4, Low-Emitting Materials – Group 2: Wall and Ceiling Finis
posted by Bruce Maine on
We have a master specification for an Acoustic Tile Restoration System. ProKote is the Base Manufacturer.
Sealant field applied by HVAC Contractor
CI-2009 MRc5:Regional Materialsposted by Marie Kranjack on
Should sealants that are field applied by the HVAC Contractor be included in the MR credits? Does the sealant fall under Div.
Regional Priority Credit Outside USA
EBOM-2009 RPc1:Regional Priorityposted by Alfred Rosales on
Hi, First and foremost, i would like to commend your team for setting up the LEED-USER - it helps us a lot on our inquiries and clarification on the different credits and pre-requisites. As for my
Predeveloped SItes
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Carl DI Giacomo on
This is mainly a tight math problem to find out to what extent is there flexibilty with the final assessment of square footage allowance Total Site: 96,369 sq.ft.
Space exclusion from ASHRAE 62.1-2007
NC-2009 IEQp1:Minimum IAQ Performanceposted by Yury Lui on
Question: If the rooms are not occupyable rooms, are they subject to the minimum OA rates in the ASHRAE 62.1-2007 standard?
FTE for buildings with multiple shifts
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
LEED NC 2009 says in p.170 "In buildings with multiple shifts, use the number of FTEs from all shifts". We have a 24hs building, with 4 shifts, some of them overlap.
Temporary irrigation – periods of drought
NC-2009 WEc1:Water Efficient Landscapingposted by Lucie Cervena on
We would like to gain credit through option 2. Some parts of our landscape area are irrigated regularly by drip system connected to the rainwater cistern.
Has anyone experienced a LEED
CI-2009 SSc1:Site Selectionposted by Alessio Zampaglione on
Has anyone experienced a LEED CI in a building that is under LEED CS final certification?