Topic | Recent |
---|---|
Ventilation in a Fire Station Apparatus bayNC-2009 IEQc2: Increased Ventilationposted by Michael Dudek on Jul 8, 2010, 6:14 pm
Can I use the garage doors in a Fire Department Apparatus Bay as a window to calculate my ventilation for ASHRAE 62.1.? We have have exhaust louvers at the rear of the building. Last reply: Roger Chang, Aug 2, 2010, 12:51 pm |
|
Hopefully eliminating the CBs will raise the quality of reviewsGeneral forumsposted by Nadav Malin on Aug 2, 2010, 9:41 am
Thanks for sharing this experience. I'm sure you're not alone. |
|
Air curtains vs. VestibulesNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on May 31, 2010, 7:12 am
Hi, Last reply: Jean Marais, Aug 2, 2010, 7:16 am |
|
Applicability of CPG sections 2.9 and 3.10CI-2009 EAc1.3: Optimize energy performance - HVACposted by Clark Denson on Feb 26, 2010, 10:08 am
Like Heather's question above, what if the equipment to be installed is less than 5 hp AND doesn't fall under the HVAC equipment categories listed in section 2.9 of the CPG, such as Variable... Last reply: John Bauer, Jul 30, 2010, 2:53 pm |
|
RE: residential high rise: leed rating system selectionGeneral forumsposted by David Posada on Jul 29, 2010, 5:45 pm
The majority of these projects have pursued LEED-NC. I'm not aware of any that have done CS - but there is movement to extend LEED-H to high-rise residential projects, and I think that Pilot... Last reply: stefano sani, Jul 30, 2010, 1:42 pm |
|
Numbers of freezers in Portfolio ManagerEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ashu Gupta on Jul 14, 2010, 1:11 am
I am surprised that the portfolio manager takes the number of freezers instead of capacity of freezers. I calculate that by increase number of nine freezers we can increase Energy star rating by... Last reply: Jenny Carney, Jul 30, 2010, 1:23 pm |
|
International ProjectEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ashu Gupta on Jul 29, 2010, 2:18 am
Is international project (outside US) not eligible to get EPA rating for LEED EB certification? is it necessary to choose national benchmark option to earn these points. Last reply: Jenny Carney, Jul 30, 2010, 1:18 pm |
|
Water Use PeriodEBOM-2009 WEc3: Water Efficient Landscapingposted by David Waggoner on Jul 8, 2010, 5:18 pm
My performance period includes April, May and June for a project in Atlanta. I am comparing the actual water use to the calculated water use. The credit says that when I establish the baseline... Last reply: Jenny Carney, Jul 30, 2010, 1:13 pm |
|
Individual document uploads for LEED Online websiteEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by John Ida on Jul 26, 2010, 7:27 pm
The leed online v3 website shows separate file upload categories. If the mechanical engineer has provided the Sequence of Operations and the Systems Narrative as part of the... Last reply: Jenny Carney, Jul 30, 2010, 1:09 pm |
|
LEED Online- Protocol Tools or CalculatorsEBOM-2009 EAc6: Emissions Reduction Reportingposted by John Ida on Jul 13, 2010, 8:39 pm
The LEED Online template for EAc6 asks to "Upload completed protocol tools or calculators presenting data for building energy use emissions." in addition to the formal documentation from Energy... Last reply: Jenny Carney, Jul 30, 2010, 1:02 pm |