facade lighting savingsCS-2009 EAc1: Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on Mar 5, 2012, 1:44 pm
Dear Marcus We conducted an energy simulation analysis and included Facade lighting as one of the energy saving features. One of the LEED Review comment is that because Facade lighting... Last reply: Marcus Sheffer, Mar 5, 2012, 2:13 pm |
|
M&V for C&S buildings of varying occupany when completeCS-2009 EAp2: Minimum Energy Performanceposted by Tony Schafer on Mar 5, 2012, 11:25 am
I have another question related to my last one regarding M&V and the energy model. In response to my last question, Marcus clarified that the energy model for a C&S building needs to be... Last reply: Tony Schafer, Mar 5, 2012, 12:32 pm |
|
peak flow calculations for 24-hr durationNC-2009 SSc6.1: Stormwater design - quantity controlposted by Chris Olson on Oct 21, 2011, 6:54 pm
Hello - My question is in regards to the 2-yr, 24-hr requirement for calculating peak runoff rate. As far as I understand, by requiring the 24-hr duration to be used with the rational... Last reply: Michael DeVuono, Mar 5, 2012, 8:23 am |
|
How to quantify a evaporation rateNC-2009 SSc6.1: Stormwater design - quantity controlposted by Brian Lodes on Mar 2, 2011, 12:45 pm
I was hoping I could get some advice on obtaining the quantity requirement of SS CR 6.1. We are trying to obtain this credit on an approximate 19 acre site. The site was originally a multi-... Last reply: Michael DeVuono, Mar 4, 2012, 9:31 pm |
|
Defining Casework/Millwork (MRc6, IEQc4, MRc5)LEED for Healthcare forumposted by Simon Sue on Mar 2, 2012, 6:16 am
For a current project we would like to clarify how LEED defines casework/millwork across multiple credits: If we would like to pursue MRc6: Design for Flexibility, using the last option "... Last reply: Simon Sue, Mar 4, 2012, 9:14 pm |
|
How to buy the HC Reference Guide?LEED for Healthcare forumposted by Mike Barker on Mar 2, 2012, 5:30 am
I can't find where to buy the Healthcare Reference Guide - it's just not listed on the website ? I must be doing something wrong ? I can find the "LEED Reference Guide for Building... Last reply: Mike Barker, Mar 4, 2012, 2:41 am |
|
define what is non-structural control and structural control 6.2NC-2009 SSc6.2: Stormwater design - quality controlposted by carol palansky on Dec 29, 2010, 7:12 pm
In doing our templete, I would like clarity of what each component is and some examples of each. Our company provided the landscaping portion for a green addition and remodel for an office... Last reply: Michael DeVuono, Mar 3, 2012, 9:40 am |
|
green roofNC-2009 SSc6.2: Stormwater design - quality controlposted by Emmanuel Pauwels on Mar 31, 2011, 8:03 am
We will install an extensive green roof in our project. Does anyone know what the runoff rarte is and how much... Last reply: Michael DeVuono, Mar 3, 2012, 9:34 am |
|
TSS removal efficiency % table?NC-2009 SSc6.2: Stormwater design - quality controlposted by Kash Boodjeh on Jul 19, 2011, 5:48 pm
What is the best resource for finding... Last reply: Michael DeVuono, Mar 3, 2012, 9:17 am |
|
Quick clarificationEBOM-2009 SSc4: Alternative Commuting Transportationposted by Wendy Gibson on Oct 8, 2010, 11:29 am
I understand that a compressed work weeks count toward SSc4. What about schedules that falll outside "rush hours" such as a 10am - 7pm shift, or a 7pm - 10am shift? I dont think it would count,... Last reply: Dan Ackerstein, Mar 2, 2012, 8:47 pm |