Forum quick links
Interesting Pilot Credit
Pilot-Credits EQpc78:Design for active occupantsposted by Nate Steeber on
I like this credit, but I don't think the language is clear. The beginning of the credit tells me that I need to have at least one main stair. Ok - understood.
Sensory Stimulation Documentation
Pilot-Credits EQpc78:Design for active occupantsposted by Zac Bradley on
The credit language does not specify the best means of documentation for stair feature option #9 (Use inviting sensory stimulation such as artwork and/or music in stairwells.Elsewher
Windows & Skylights required for feature #7?
Pilot-Credits EQpc78:Design for active occupantsposted by RDK E&S on
Question is in reference to "7. Provide daylighting at each floor/roof level of the stair(s) using either windows and/or skylights of at least 8 square feet (1 square meter) in size.
25'-0" Max Footpath to Main Staircase
Pilot-Credits EQpc78:Design for active occupantsposted by Kelsey Jensen on
Our current project places the main staircase in view of the main lobby and corridor.
Existing Buildings
Pilot-Credits EQpc78:Design for active occupantsposted by Rubén M. R. on
This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.
Access to at least 50% of tenant occupant floors
Pilot-Credits EQpc78:Design for active occupantsposted by Christopher Heine on
The credit language states "Buildings must have at least one main stair that enables occupants to travel between the building entrance floor(s), occupant’s own destination floor and common use floo
Pilot Credit 101
Pilot-Credits EQpc78:Design for active occupantsposted by Kiyomi Kurooka on
This was the first time our office participated in a Pilot Credit.
Other feature that meets the intend of the credit?
Pilot-Credits EQpc78:Design for active occupantsposted by Marina Mihalcea on
Hi! What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?
Lighting Levels
Pilot-Credits EQpc78:Design for active occupantsposted by Henry Richardson on
Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.