Post a question or comment
Credit Filters
Integrative Process
Filter by location
Forum
Topic
Replies
Recent

Cost Analysis?

Pilot-Credits PC60:Integrative Process
posted by  Crina Bosch   on 

Thinking about pursuing this credit as an innovation for a LEEDv2009 Schools project. I'm confused about the requirements, however.

0

Integrative Process

Pilot-Credits PC60:Integrative Process
posted by  Janna Alampi  on 

Building design should always be an integrative process. The tools found in this Pilot Credit would benefit any project.

1
Thu Mar 6, 2014, 6:10 pm

Whole System Integration Process Guide not referenced

Pilot-Credits PC60:Integrative Process
posted by  Heather DeGrella  on 

Does any body know why this pilot credit does not use the reference standard, titled “ANSI/MTS Whole System Integration Process Guide (WSIP)-2007 for Sustainable Buildings and Communities.” It was

1
Wed Aug 8, 2012, 2:52 pm

Integrative Pilot Credit - Design or Construction Credit

Pilot-Credits PC60:Integrative Process
posted by  Devki Wright  on 

Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?

1
Tue May 24, 2016, 12:12 am

Integrative process

Pilot-Credits PC60:Integrative Process
posted by   Habitech Distretto Tecnologico Trentino  on 

I find this credit really interesting and it is very important to have this as a prerequisite for LEEDv4

2
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Fri Nov 18, 2016, 6:20 pm

Integrative Process-Value Engineering

Pilot-Credits PC60:Integrative Process
posted by  Susan Coy  on 

Do you use Value Engineering in documenting this process?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue May 24, 2016, 12:18 am