Forum quick links
5 year replacement period?
CI-v4 EAp3:Fundamental refrigerant managementposted by Laura Charlier on
"For existing buildings with existing equipment or projects that use existing central plants, teams will need to check if CFC-based refrigerants are being used.
Fundamental refrigerant management for a "District Energy System"
CI-v4 EAp3:Fundamental refrigerant managementposted by Ralph Bicknese on
To be clear, does the upstream equipment in a District Energy System need to be considered for the prerequisite or only for the enhanced refrigerant management credit? Based on the "project t
Cooling Towers
CI-v4 EAp3:Fundamental refrigerant managementposted by Laura Charlier on
If cooling tower is being replaced as part of project, does that need to be included in calcs?
Existing small HVAC&R units
CI-v4 EAp3:Fundamental refrigerant managementposted by Mercedes Ferreira on
For the Fundamental Refrigerant Management credit under the ID+C rating system, when the requirement says, "Existing small HVAC&R units (defined as containing less than 0.5 pound (225 grams) of
Existing Chillers in Basement (not in project boundary)
CI-v4 EAp3:Fundamental refrigerant managementposted by Heather Zeto on
Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).