Forum quick links
Forum
Topic
Replies
Recent
Fixtures in European Projects – What do we do about the pressure given the Flows in Europe
CS-v4 WEc2:Indoor water use reductionposted by Konstantina Kalliakoudi on
Hello
3
Fri Sep 6, 2024, 6:19 pm
District cooling chilled water
CS-v4 WEc2:Indoor water use reductionposted by Dina El-Sady on
If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations?
1
Fri May 13, 2022, 11:32 pm
piezometric tower as alternative water sources
CS-v4 WEc2:Indoor water use reductionposted by Gloria Rozzini on
hello everyone. In one of our projects we have a piezomentric tower previously used as a process water.
1
Fri Aug 6, 2021, 1:10 am
Residential project water fixtures and appliances water use
CS-v4 WEc2:Indoor water use reductionposted by Andrzej Gutowski on
Dear collegues,
1
Fri Jan 13, 2023, 5:46 pm
Indoor Water Use Reduction_Well water
CS-v4 WEc2:Indoor water use reductionposted by Giuseppina Amorusi on
Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat
1
Fri Jan 13, 2023, 5:56 pm