New LEED project inside an already certified LEED Project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Husam Haron  on 

An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Tue Sep 15, 2020, 2:45 pm

LEED Basement Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Mar 4, 2020, 10:47 am

Reasonable Boundary - other support builidngs beyond project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Nicole Kimoto  on 

We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Feb 14, 2018, 10:18 am

Identifying LEED boundary to exclude portion of project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kristen Dotson  on 

The registered project includes commercial core and shell space with an adjoining housing tower which will be scored under the Evergreen Sustainable Development Standard.

1
Sat Mar 8, 2014, 3:37 am

LEED Project Boundary - Football Stadium

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Lisa VandeVoort  on 

Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?

0

LEED Boundary and Non-contiguous reconfigured areas

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aaron Ketner  on 

Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.

0

Reasonable Site Boundary for Lighting

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Carol Liebst  on 

I am working on a school on an army base - to be LEED Silver (2009). I want to be I am correctly establishing the lighting boundary.

1
Thu Mar 21, 2013, 2:43 pm

LEED Project Boundary for Site Prepped by Previous Project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Cassandra Coffin  on 

I am working on a new residence hall for a college campus and have a couple of questions in regards to the LEED project boundary. Due to multiple scheduling impacts, the site work and deep foundat

0

LEED Site Boundary - Campus - easement for utilities

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michele Helou  on 

'The LEED project boundary must include .......all land that was or will be disturbed for the purpose of undertaking the LEED project.' What if a small section an adjacent campus parking lot that

0

LEED Boundary on large site multiple buildings - 1 certifiable

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Alexander Clark  on 

I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.

0