New LEED project inside an already certified LEED Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Husam Haron on
An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.
LEED Basement Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.
Reasonable Boundary - other support builidngs beyond project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Nicole Kimoto on
We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?
Parking under the building but not belonging to the same owner
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mark Frey on
Hi, We are working on a new construction of an office building located on a site where 3 other buildings will be also constructed.
LEED Project boundary and adjacent road.
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lawrence Lile on
We are building a LEED project next to an existing road. It is a gravel road owned by the same entity that owns the LEED project, and they also own the property across the road.
Parking Garage above Non LEED Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kar Kerman on
I'm not sure whether I can (or should) include a parking garage in a project I'm working on. The parking garage is located in an adjacent building and has a separate owner.
Changes to Campus Boundary?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by David Gibney on
It was recently brought to my attention that our Master Site (under the older "block" registration process) has changed since our original design intent.
Core and Shell Renovation/Addition Parking not in Scope
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ed Clark on
We are looking at a Core and Shell Renovation/Addition. We will pursue 2009 C&S and EBOM afterwards.
Is it possible to modify a LEED boundary already registered?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mauricio J Perez R on
Dear all, We are developing the design phase of a LEED Project which is already registered in the LEED online.
construction site facilities outside of LEED project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Doreen Kruschina on
Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.