Pre-rinse spray valves

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Kelly Beisswanger  on 

Trying to figure out if I need to and how/where to include values for pre-rinse spray valve use.

1
Thu Sep 24, 2020, 7:49 pm

It is mentioned that well and

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ameet AA  on 

It is mentioned that well and pond water does not count for this credit. extracting water from onsite Aquifer using borehole can considered for this credit as the project will not be using any pota

1
Fri Nov 23, 2012, 12:01 am

Trouble meeting prerequisite in school!

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Gail Vittori  on 

We are working with a school that is struggling to meet the prerequisite given programming and district requirements.

1
Wed Sep 5, 2012, 10:09 pm

Residential Type Sinks in Middle School Classroom

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sara Zoumbaris  on 

Hi, We are working on a middle school that has 2, Home Economics classrooms with residential kitchen-style fixtures; I would assume these should be included within my calculation?

1
Wed Dec 30, 2015, 4:35 pm

Availability of 2/4 LPF WCs

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, A Contractor of a LEED project has been struggling to find dual flush 2/4 LPF WCs in Lebanon (the Middle East). Can someone please provide me with a list of suppliers who readily have 2

1
Fri Feb 17, 2012, 6:33 pm

10 second flow rate

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Lauren Sparandara  on 

I received the final comment for one of my LEED for Schools projects: "Metered faucet duration has not been revised from 10-second duration to the default 12-second duration as required.

1
Mon Nov 26, 2012, 8:07 pm

Adjustable valve for WC fixtures

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a reg

1
Fri Feb 17, 2012, 6:19 pm

Pre-Rinse Spray Valve Before 11/1/2011 addenda

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Crina Bosch   on 

Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Dec 30, 2015, 4:48 pm

Default Fixture use for a School Project (shower)

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Markus Henning  on 

I am working on a school project and actualy calculating WEp1. I am wondering that the default fixture use for a school indicate no daly uses for a shower for students.

2
Wed Dec 30, 2015, 3:55 pm

school example in documentation toolkit?

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  William Weaver  on 

I was wondering if the LEEDuser team could provide an example of a completed template for a school project in the documentation toolkit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up