Forum quick links
Space Definition for IAQ Calculations
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi,
We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.
Minimun rate ventilation for enclosed parking with contaminant sensors
CS-2009 IEQp1:Minimum IAQ Performanceposted by Hendrick Munoz on
Goord morning,
C&S Occupancy
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi,
We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.
Air Intake Minimum Separation Distance - dock
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Smith on
Dear all,
Future tenant space & outside air calculations
CS-2009 IEQp1:Minimum IAQ Performanceposted by Gail Vittori on
The project we are working on has a ground floor tenant space that has the potential to be a restaurant, cafe, small grocer, or even non-food retail (though this last one is relatively unlikely
Single-zone, multiple systems
CS-2009 IEQp1:Minimum IAQ Performanceposted by Nate Steeber on
Hey all,
I'm sorry if this is a repeat, I tried to search for this specific issue in the forum, and cannot find anything.
CS v2009 ventilation need for each space
CS-2009 IEQp1:Minimum IAQ Performanceposted by MERVE AYGENC on
Does each space need to achieve the airflow suggested by ASHRAE separately or do we considered the overall achievement while using Minimum IEQ Performance Calculator?
Particulate Matter Removal
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi to all of you, as per Standard 62.1-2007, in Section 5.9, one of the minimum requirements for mechanically ventilated spaces, a MERV 6 filter shall be provided upstream of all cooling coils.
tenant lease language
CS-2009 IEQp1:Minimum IAQ Performanceposted by Adam Targowski on
What has to be included in the tenant lease for the shopping mall spaces?