EAc 5.1 for LEED C&S

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  S Nagarajan  on 

Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.

1
Thu Nov 6, 2014, 11:04 pm
1
Mon Aug 16, 2010, 4:36 pm

Energy Model Calibration by Post Construction data

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Gabriela Hernández Castillo  on 

Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures.

1
Mon Jul 8, 2013, 6:37 pm

Sub Metering of Service Hot Water (Domestic Hot Water)

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.

1
Fri Jan 8, 2016, 2:25 am

Tenant Submetering connected to BMS?

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Marco Abdallah  on 

We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.

1
Fri Aug 24, 2012, 12:58 pm

Separating lighting metering from plug load metering.

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Rudolph Carneiro  on 

I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.

1
Fri Oct 25, 2013, 1:22 pm

Model Calibration - Margins for Error

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

For a new office building would it be acceptable to use these error margins for an M&V Report.

1
Fri Apr 21, 2017, 5:07 pm

EA Credit 5.1: Base Building Sub-metering

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ian McCall  on 

Hello all, I am working on a large Core and Sheel project composed of office spaces and commercial centre (in France). The comercial centre is 5 stories high and occupied by one single tenant.

1
Wed Jun 4, 2014, 11:48 pm

List energy end uses

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Mike D  on 

"The M and V Plan omits the table or listing of the project’s energy end uses as required by the form." However, the Plan we have submitted lists the following: Locations and types of energy meter

1
Tue Jun 18, 2013, 1:55 pm

M&V period for LEED 2009 C&S projects for EAc5.1 + EAc5.2

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Philip Herriges  on 

The LEED reference guide is very particular in the language that they use to describe the intent and stragegies for EAc5.1 and 5.2 for C&S as being distinct from NC & Schools. For NC&