Forum quick links
Tenant Lease Agreement Cases:
CS-2009 WEc3:Water Use Reductionposted by Diego Escalona on
Is possible, for a LEED CS project to apply for the three cases (A, B y C), that are expressed in the appendix 4: Tenant Lease Agreement. I.e.
Precertification credits online
CS-2009 WEc3:Water Use Reductionposted by Jakub Netolicky on
Hello, at the moment we are doing precertification, when I want to attemt some credits on website LEEDonline, some credits remain 0, therefore, we have only few points in total.
Compliance if there are no fixtures on the design
CS-2009 WEc3:Water Use Reductionposted by Jose Salinas on
Hi, The Owner is constructing a tower with high end tenants on the his scope.
Autocontrol / metering urinals - 12sec or optional?
CS-2009 WEc3:Water Use Reductionposted by Petr Vogel on
Dear all, when calculating proposed case water consumption budget for public autocontrol / metering urinals…is there the same requirement like the 12sec requirement for public autocontrol / meteri
Lease Language Mandate for Fixture Flow Rate Thresholds
CS-2009 WEc3:Water Use Reductionposted by Jay Murray on
Similar to Diego's comment, we actually have two buildings where we are installing the plumbing infrastructure as part of the Core and Shell scope, but not the acxtual fixtures.
How can I filled the LEED Online form
CS-2009 WEc3:Water Use Reductionposted by Somsak Jidmon on
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w
Captured rainwater for flushing toilets- WE Cr.3
CS-2009 WEc3:Water Use Reductionposted by Tomas Kurka on
Hello, I have a question regarding project of office building in Prague( LEED 2009 CS). I didnt find anywhere how to add into WE Cr.3 LEED ON-LINE Form the amount of rainwater used for flushing to