1. We have a project site that's circa 1813 in the historic French Quarter. While earthwork was underway, 100 SF or so of 4"+ thick stones were dug up during trenchwork and we are going to be bale to use them in the project to replace damaged/broken stones the Architect had originally counted on using. So naturally I'm thinking the dug up stones can positively apply towards: MRc2 MRc3 MRc4 MRc5 Am I incorrect in thinking the stones can apply to all MRc2-5? 2. Along these same lines, we will be salvaging old historic shutters from the existing building, restoring them and re-installing them. Since they are for windows and can not contribute to either MRC1.1 or MRc1.2, I assume the shutters can apply to MRc2-MRc5 as well. Would LEED agree for shutters? I think most would agree about MRc2, MRc3 and MRc5 however what about MRc4? Thank you very much! Debra
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.