Our CS project has 66 FTEs. When I completed the SSc4.2 template on-line it automatically populated the "number of showers required" as "0". Can that be correct? I know 66 FTEs X .5% (or .005) is only .33, but I assumed we would have to round up to 1 shower/changing room. We don't have a shower/changing room in our building or within 200 yards unfortunately (it's right outside this distance) otherwise I would just include the shower anyway. Has anyone run into this before? Any guidance?