Hello LEEDuser forum,
I am doing the documentation for a small building (4,500 sq. ft) with a small mechanical system. I have made my way through the documentation requirements for EAp1, but the Sequence of Operations has me stumped. All the examples I have found are for much larger systems than the one I am working with. Any suggestions?