Forum discussion

NC-2009 EAp3:Fundamental Refrigerant Management

Manufacturer Name and Model Number

Hello, As you know, the LEED online Letter template requires us to input the Manufacturer Name and Model Number of the refrigeration systems being used on the project The issue we're facing is that the exact models have not been chosen yet. They will be selected and purchased by the contractor based on the performance specifications. The M&E have already specified the max Refrigerant Charges allowed and the fact that CFCs are prohibited. Knowing that this is a design credit, can I upload the excerpt of specs showing the max Refrigerant Charges and the non-CFC requirement ? Or should I wait till the contractor chooses the models (which is at construction phase) Thanks for help,

6

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Sat, 04/23/2011 - 17:23

I would wait till you have the required information and submit at the construction phase.On the other hand, you could try entering the information now as best you can, and you'll have a chance to modify it later if the reviewer questions it.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.