Has anyone actually made "a plan" for this credit? based on the I-BEAM or EPA document references, this document could be of incredible length, with charts, tables, complaint logs, etc. Has everyone done these plans as detailed as thosed referenced in the LEED guide?
I think our owner would freak out if we presented him with a 200-page document.