Commissioning Fees

NC-v4 EAc1: Enhanced Commissioning
posted by Tom Grassi on Aug 13, 2019, 10:57 am

I am looking for updated studies with cost data for LEED v4 Commissioning services, including Enhanced, Envelope and Monitoring-Based Commissioning.  "The Cost of LEED v4" is a good publication,...

Last reply: Tom Grassi, Aug 20, 2019, 6:00 pm

Public lavatory (restroom) faucet water sense?

CI-v4 WEp1: Indoor water use reduction
posted by Carlos Dobobuto on Aug 20, 2019, 2:12 pm

Hi, we are looking for a Public lavatory (restroom) faucet with water sense label but all we have found have higher consuption that the base line.

Can we apply for this prerrequisite with...

Institute of Transportation Engineers’ Transportation Planning Handbook, 4th edition, Table 11-12

NC-v4.1 LTc7: Reduced parking footprint
posted by chris buntine on Jun 23, 2019, 3:24 am

Can someone share an excerpt of the base ratios tables from the 4th edition of the Transport Planning Handbook please?

Last reply: April Rice, Aug 20, 2019, 1:36 pm

Structural Steel Backup Letters

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Michelle Rosenberger on Aug 19, 2019, 12:57 pm

We have always used industry standard steel letters as backup for structural steel...

Last reply: Michelle Rosenberger, Aug 20, 2019, 12:57 pm

Minimum IAQ Requirement: Ashrae 62.1 vs. Ashrae 170

CS-2009 IEQp1: Minimum IAQ Performance
posted by Daniel Joseph on Aug 29, 2013, 5:17 pm

We are in the midst of certifying a Medical office core and shell building. Our scope includes the landscaping, parking lot, side walks, and building shell. The tenant will be responsible for all...

Last reply: Richard Manning, Aug 20, 2019, 9:25 am

PIf2 Site Characteristics for individual building project on a LEED Campus

Schools-2009 PIf2: Project Summary Details
posted by Yasha Ogg on Aug 20, 2019, 9:19 am

I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building. Phase 2 will consist of demo of two smaller buildings...

How long after a project is completed can credits be submitted?

Healthcare-v4 INc1: Innovation
posted by Stephanie Kreps on Aug 19, 2019, 2:08 pm

If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed? And how much longer after the project has been...

Trellis in Vegetated Area

NC-2009 SSc5.2: Site development - maximize open space
posted by Summer on Aug 20, 2019, 6:30 am

I'm working on a project with an open space and vegetated area compliant to the credit requirement. By this time, the owner wants to put a trellis with roof (which is not part of the building...

Are Shades 'Furniture and Furnishings'?

CI-v4 EQc2: Low emitting materials
posted by Julie Hendricks on May 31, 2019, 12:53 pm

Motorized  and manual shades (such as Mechoshade) are in Division 12.  Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?

Last reply: Allen Cornett, Aug 19, 2019, 11:58 am

Update information for previously awarded credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Silvia Ruiz on Jun 27, 2013, 12:37 pm

Our project got back the Final Design Review, but changes that affect one Awarded credit occurred during construction. Can we revise the previously Awarded credit calculations and submit this...

Last reply: Marcus Sheffer, Aug 19, 2019, 11:11 am