We are pursing certification of Japanese company's headquarter office. Our project building has both air-cooled heat pump system and geothermal heat pump system with many bore holes that collect heat in winter and reject heat in summer. It does not include a cooling tower and does not use the latent heat of the evaporative cooling of water. Additionally, the project does not receive any cooling from a District cooling system. The baseline system designated by ASHRAE 90.1-2010 Appendix G Table G3.1.1 is system 7.

Our concern is that the demonstration of the above will be sufficient to achieve the documentation requirements for the credit. Does anyone answer our question?