Consider the certifications of prospective acoustics consultants. Many are INCE Board Certified or members of the National Council of Acoustical Consultants (NCAC). These certifications are not necessary but can help in making hiring decisions.
For Core and Shell buildings, project teams must use a feasible tenant layout and plan to demonstrate that it meets the credit requirements. A consistent and appropriate occupancy must be used across credits.
Direct-line-of-sight can pass through two interior glazing surfaces before reaching exterior glazing, but not through solid doors, walls, or partitions taller than 42”.
Direct-line-of-sight is determined by visibility between the vision glazing (between 2’6” and 7’6” inches above the floor) without obstructions such as full-height partitions or solid doorways.
In projects with operable windows, occupants may not know when conditions are best for opening the windows. Implement a system so that occupants are informed of when to open and close the windows to achieve designed performance and optimal comfort.
Window-to-wall ratios may be fixed if your project is pursuing a prescriptive compliance path for EAp2: Minimum Energy Performance and EAc1: Optimize Energy Performance. These fixed ratios will impact access to views and glazing areas. Check the ASHRAE Advanced Energy Design Guide and the Advanced Buildings Core Performance Guide for required window-to-wall ratios. If a building envelope window-to-wall ratio is over 40% there will be a penalty in the energy model for EAc1. The same is true if skylight-to-roof ratio is more than 5%.