Assign a responsible party to input the subcontractors’ tracking forms into the Materials Calculator (see Documentation Toolkit). A LEED consultant or an administrative assistant in the GC’s office may be the best choice for this role.
Streamline documentation and research by taking data gathered from subs via the Environmental Materials Reporting Form and transfer it into a master spreadsheet for all the items being tracked for each product across MR and IEQ credits. For example, you may need to ask the millworker for regional information for MRc5, certified
The GC functions as the overall quality assurance provider for this credit. Responsibilities include conducting weekly reviews of subcontractor product submittals and tracking forms.
Enabling coordination and communication among the GC, subcontractors and design team early in the process can minimize scheduling delays and pushback from subcontractors.
Give the GC and subcontractors the following tools to help them track materials data for all MR and IEQ credits. (See the Documentation Toolkit for access.)
LEED documentation and materials tracking are usually the GC’s responsibility even though specific materials selection may have been already determined by the architect or designer.
Include submittal requirements within each targeted construction spec section and add general requirements to the Division 1 bid package. Include a copy of any submittal documents that the contractor may need to fill out.
Whenever possible, designate in the construction specifications that contractors use specific product manufacturers that you have verified as producers of locally manufactured and extracted items. This will help save research time for the contractors.
Analyze the initial cost budget to know what materials the project can target and incorporate LEED requirement language accordingly into construction specs for the specific materials. The contractor will appreciate not having to fill out forms for materials that are not local, or that have so little cost value that it is a waste of time.
Incorporating the LEED requirements directly into the drawings as well as into the specs is a good way to remind the contractor and subcontractors of the requirements.