By submitting your email, you gain access to hundreds of BuildingGreen articles about green building and innovations and agree that BuildingGreen may send you communications with updates about sustainable design and construction. You may unsubscribe at any time. Terms and Conditions and Privacy Policy apply.
Your email address is safe with us
Thousands of architects, designers, and engineers trust our research and advice... you can trust us with your email address.
BuildingGreen will never share or sell your contact information.
Your email address is safe with us
Thousands of LEED professionals trust our research and advice... you can trust us with your email address.
LEEDuser will never share or sell your contact information.
Loading, please wait a moment...
destination: /, mode: buy
You already have a BuildingGreen account — please enter your password:
Your reset password email has been sent.
Click here to send a password reset link to
Loading...
You are already entitled to LEEDuser premium access through .
To get started, create a personal profile. This will give you full access to LEEDuser Premium through .To get the free reports, please create a personal profile
Loading...
Create your account to join
The most trusted voice in sustainable architecture and design
For more than 25 years BuildingGreen has never accepted ads or sponsorship, making us an unbiased resource you can count on.
“I’ve relied on BuildingGreen for over a decade—it’s one of the most reputable sources for cutting edge green building news & product research.’
—Mara Baum, Sustainability Director, HOK
Thank you for signing up for LEEDuser
IMPORTANT: Please check your email to verify your account.
You are now part of ’s group.
Watch your email for tips from our experts on getting the most from LEEDuser.com.
Here are three special reports you can use today:
Can We Replace Foam Insulation? – There are a lot of reasons to avoid foam, but its high performance can make it a hard habit to kick, as designers are finding out.
How WELL Got Green Building’s Groove Back – WELL is the hottest four-letter word in sustainable design. But will it work to the benefit or the detriment of green building?
20 Ways to Advance Sustainability in the Next Four Years – In this age of political revolution and environmental urgency, it’s time to step back and take a look at priorities, challenges, and opportunities. Here’s our founder Alex Wilson’s take on the best ways to advance sustainability.
Emphasize team interaction and construction involvement when defining the project scope with key design team members. Contractor and designer meetings can help ensure correct construction practices and avoid high change-order costs for the owner.
Plan for frequent site visits by the mechanical designer and architect during construction and installation to make sure construction meets the design intent and specifications.
If pursuing ECM for non-regulated loads, calculate energy saving for each measure separately if you are, for example, installing an energy-efficient elevator instead of a typical one so that the reduction would contribute to total building energy savings.
Complete at least half of the energy modeling effort by the end of the design development stage. Help the design team to finalize strategy through intensive, early efforts in energy modeling. Once the team has a design direction, the modeler can develop a second model during the construction documents phase for final confirmation.
Demonstrating reductions in non-regulated loads requires a rigorous definition of the baseline case. The loads must be totally equivalent, in terms of functionality, to the proposed design case. For example, reducing the number of computers in the building does not qualify as a legitimate reduction in non-regulated loads. However, the substitution of laptops for desktop computers, and utilization of flat-screen displays instead of CRTs for the same number of computers, may qualify as a reduction.
The Core Performance Guide requires an integrated design contributed by the architect, mechanical and electrical engineers, and lighting designer. The project manager must take responsibility for shepherding and documenting the collaborative process to demonstrate compliance.
The architect, mechanical engineer, and lighting designer need to discuss each requirement and its design ramifications. Hold these meetings every six to eight weeks to discuss progress and make sure all requirements are being met.
As a prescriptive path, this option relies heavily on following the requirement checklist, which is used throughout the design process to track progress. To assist design development, provide all critical team members—not limited to the architect, mechanical and electrical engineers, and lighting designer—with a checklist highlighting their appointed tasks.