In developing a CWM plan, take into account regional constraints, and weigh the feasibility of recycling or salvaging materials against other environmental factors, such as the impact of hauling waste long distances if recyclers are far from the project site.
There are industry standards on good practices for deconstruction as well as directories of experienced contractors, such as the Deconstruction Institute (see Resources).
Thinking long term, consider what design decisions can increase the likelihood of deconstruction further down the road when specifying materials and systems to be used in the current project. Material selection and assembly type can impact how materials may be deconstructed and reused at the end of the building’s life-cycle.
The energy model itself will not account for any change in plug loads from the baseline case, even if your project is making a conscious effort to purchase Energy Star or other efficient equipment. Any improvement made in plug loads must be documented separately, using the exceptional calculation methodology (ECM), as described in ASHRAE 90.1-2007.
Demolition projects can give away furniture, computers, and other equipment. Projects can also reuse items like doors, and crush demolished concrete and other paving materials to be reused as fill onsite.
Construction materials vary with project location and building type. Some materials are easier to recycle than others. For example, copper wire and steel studs are readily recycled into new products, but vinyl tiles may not be. Research and specify what materials can be recycled, reused, or salvaged in the project’s municipality or region—and design with these materials so that waste scrap can be diverted from the landfill. For example, specify carpet from a manufacturer that has a take-back program, or ceiling tiles that are easily recyclable.
Some energy efficiency features may require special training for operations and maintenance personnel. For example, cogeneration and building automation systems require commissioning and operator training.
The benefit of designing for energy efficiency is realized only during operations and maintenance. Record energy use to confirm that your project is saving energy as anticipated. If you are not pursuing EAc5: Measurement and Verification, you can implement tracking procedures such as reviewing monthly energy bills or on-the-spot metering.
Develop an operations manual with input from the design team in collaboration with facility management and commissioning agent if pursuing EAc3: Enhanced Commissioning.