By submitting your email, you gain access to hundreds of BuildingGreen articles about green building and innovations and agree that BuildingGreen may send you communications with updates about sustainable design and construction. You may unsubscribe at any time. Terms and Conditions and Privacy Policy apply.
Your email address is safe with us
Thousands of architects, designers, and engineers trust our research and advice... you can trust us with your email address.
BuildingGreen will never share or sell your contact information.
Your email address is safe with us
Thousands of LEED professionals trust our research and advice... you can trust us with your email address.
LEEDuser will never share or sell your contact information.
Loading, please wait a moment...
destination: /, mode: buy
You already have a BuildingGreen account — please enter your password:
Your reset password email has been sent.
Click here to send a password reset link to
Loading...
You are already entitled to LEEDuser premium access through .
To get started, create a personal profile. This will give you full access to LEEDuser Premium through .To get the free reports, please create a personal profile
Loading...
Create your account to join
The most trusted voice in sustainable architecture and design
For more than 25 years BuildingGreen has never accepted ads or sponsorship, making us an unbiased resource you can count on.
“I’ve relied on BuildingGreen for over a decade—it’s one of the most reputable sources for cutting edge green building news & product research.’
—Mara Baum, Sustainability Director, HOK
Thank you for signing up for LEEDuser
IMPORTANT: Please check your email to verify your account.
You are now part of ’s group.
Watch your email for tips from our experts on getting the most from LEEDuser.com.
Here are three special reports you can use today:
Can We Replace Foam Insulation? – There are a lot of reasons to avoid foam, but its high performance can make it a hard habit to kick, as designers are finding out.
How WELL Got Green Building’s Groove Back – WELL is the hottest four-letter word in sustainable design. But will it work to the benefit or the detriment of green building?
20 Ways to Advance Sustainability in the Next Four Years – In this age of political revolution and environmental urgency, it’s time to step back and take a look at priorities, challenges, and opportunities. Here’s our founder Alex Wilson’s take on the best ways to advance sustainability.
Meeting the prescriptive requirements of Options 2 and 3 is not common practice and requires a high degree of attention to detail by your project team. (See the Documentation Toolkit for the Core Performance Guide Checklist.) These paths are more straightforward than Option 1, but don’t think of them as easy.
Develop the thermal comfort survey after determining space programming, designing the mechanical system, and confirming compliance with EQc7.1. It is best to customize the occupant survey for the building’s planned HVAC systems. Questions may be structured differently depending on whether you are assessing the performance of an evaporative cooling system, an in-floor radiant heating system, or a natural ventilation system.
It is also helpful for projects attempting this credit to pursue EQc6.2: Controllability of Systems—Thermal Comfort. When occupants have control of their thermal comfort they tend to be more satisfied.
It is usually a good idea to do a “mini air flush” (if your project is not attempting EQc3.2) before occupancy to help remove any lingering VOCs from the construction process. This can be as simple as putting industrial sized fans in the window and pumping in fresh air overnight or running the HVAC exhaust on high for a few days. (See EQc3.2: Construction Indoor Air Quality Plan—Before Occupancy if the team wants to do a full flush-out for an additional LEED point.)
Post signs at the construction site that reminds subcontractors to follow LEED requirements for using urea-formaldehyde-free composite materials and laminating adhesives. (Link to Signage UF)
It is usually a good idea to do a “mini air flush” (if your project is not attempting EQc3.2) before occupancy to help remove any lingering VOCs from the construction process. This can be as simple as putting industrial sized fans in the window and pumping in fresh air overnight or running the HVAC exhaust on high for a few days. (See EQc3.2: Construction Indoor Air Quality Plan—Before Occupancy if the team wants to do a full flush-out for an additional LEED point.)
Streamline documentation and research by keeping a master spreadsheet of all the items being tracked for each material across MR and IEQ credits. For example, you may need to ask the millworker for regional information for MRc5, certified