By submitting your email, you gain access to hundreds of BuildingGreen articles about green building and innovations and agree that BuildingGreen may send you communications with updates about sustainable design and construction. You may unsubscribe at any time. Terms and Conditions and Privacy Policy apply.
Your email address is safe with us
Thousands of architects, designers, and engineers trust our research and advice... you can trust us with your email address.
BuildingGreen will never share or sell your contact information.
Your email address is safe with us
Thousands of LEED professionals trust our research and advice... you can trust us with your email address.
LEEDuser will never share or sell your contact information.
Loading, please wait a moment...
destination: /, mode: buy
You already have a BuildingGreen account — please enter your password:
Your reset password email has been sent.
Click here to send a password reset link to
Loading...
You are already entitled to LEEDuser premium access through .
To get started, create a personal profile. This will give you full access to LEEDuser Premium through .To get the free reports, please create a personal profile
Loading...
Create your account to join
The most trusted voice in sustainable architecture and design
For more than 25 years BuildingGreen has never accepted ads or sponsorship, making us an unbiased resource you can count on.
“I’ve relied on BuildingGreen for over a decade—it’s one of the most reputable sources for cutting edge green building news & product research.’
—Mara Baum, Sustainability Director, HOK
Thank you for signing up for LEEDuser
IMPORTANT: Please check your email to verify your account.
You are now part of ’s group.
Watch your email for tips from our experts on getting the most from LEEDuser.com.
Here are three special reports you can use today:
Can We Replace Foam Insulation? – There are a lot of reasons to avoid foam, but its high performance can make it a hard habit to kick, as designers are finding out.
How WELL Got Green Building’s Groove Back – WELL is the hottest four-letter word in sustainable design. But will it work to the benefit or the detriment of green building?
20 Ways to Advance Sustainability in the Next Four Years – In this age of political revolution and environmental urgency, it’s time to step back and take a look at priorities, challenges, and opportunities. Here’s our founder Alex Wilson’s take on the best ways to advance sustainability.
Consider stating big picture goals for the project in terms of minimum efficiency levels and specific payback periods. For example: “Our goal is to exceed a 20% reduction from ASHRAE 90.1, with all efficiency measures having a payback period of 10 years or less.”
Some energy efficiency features may require special training for operations and maintenance personnel. For example, cogeneration and building automation systems require commissioning and operator training.
During LEED submission, your project team needs to make an extra effort to support the credit with the completed checklist and the required documents. Although not every requirement may be mentioned in the LEED documentation, the supporting documents need to cover all requirements with narratives, wall sections, mechanical drawings, and calculations.
During LEED submission, the project team needs to make an extra effort to support the credit documentation with the completed checklist and the required documents. Although the LEED rating system does not list detailed documentation, it is best practice to send in supporting documents for the prescriptive requirements from the AEDG. The supporting documents should include relevant narratives, wall sections, mechanical drawings, and calculations.
It is common for the LEED reviewers to make requests for more information. Go along with the process—it doesn’t mean that you’ve lost the credit. Provide as much information for LEED Online submittal as requested and possible.
Emphasize team interaction and construction involvement when defining the project scope with key design team members. Contractor and designer meetings can help ensure correct construction practices and avoid high change-order costs for the owner.