Not more than four RP points can be earned, even if you earn all six RP credits. However, it makes sense to aggressively pursue as many RP credits as possible, in case a credit becomes unattainable during the design and construction process or one of your RP submittals is denied during certification review. Doing so also supports the environmental priorities of your region.
Discuss as a team the value of these additional RP bonus points, to be sure that everyone is on board with pursuing them. Make sure the additional benefit is understood so that the proper emphasis is put on those credits.
Refrigerants are not harmful to the atmosphere until they are released into it. Comply with best-practice refrigerant management regulations to minimize leakage rates during operation and when installing or removing new equipment.
Organize documentation of equipment specs and the maintenance requirements intended to minimize refrigerant leakage and transfer this information to the owner’s facility managers.
Specifying high-quality equipment with a long lifespan can reduce environmental impacts, since most leakage occurs during installation and decommissioning. For information about the service life of different types of HVAC equipment, refer to the 2007 ASHRAE Applications Handbook—HVAC Applications. (See Resources.)
The default leakage rate used in the credit form calculator is 2%, and the end-of-life refrigerant loss value should be 10%. If your project has equipment with different leakage rates, those values can be used instead.
Check the table of commonly used refrigerants in the LEED Reference Guide. Identify those that have lower values of ozone-depleting or global-warming potential (
Operations and maintenance staff need to be on board if you select a system that is unconventional or requires a new maintenance protocol. It is best to have operations and maintenance staff participate in MEP meetings regardless of system type.
EPA’s SNAP program (see Resources) lists a range of alternatives to ODP substances. Review these alternatives and confirm the applicability to your system type. Consider using these to help meet the credit requirements.