Overlapping strategies and technologies address SSc6.1: Stormwater Design—Quantity, as well as SSc6.2. Vegetative swales, for example, can contribute to both credits—integrate the requirements of both for best results. Keep in mind, however, that each credit requires different calculations and methodologies. Reducing the quantity of stormwater runoff for SSc6.1 does not always equate to a quality improvement for SSc6.2.
The easiest way to earn this credit is through decreasing your project’s impervious area by reducing the building footprint, increasing landscaped areas, and disconnecting impervious areas—designing sidewalks, roofs, and parking areas so that the runoff is not directed to a drainage system or other hardscapes.
The commissioning agent’s involvement in team meetings, both in pre-construction and construction, provides the subcontractors the chance to understand the role, tasks and expectations of a
Getting feedback on ventilation performance from occupants through surveys can help to identify potential problems that may become expensive if they go unnoticed.