For each section, draw a sight line at 42” above the floor across the section to the perimeter glazing.

For each section, draw a line originating from 42” above the floor (typical eye height) to the perimeter glazing demonstrating access to vision glazing and views to the outside.

Hold an integrated design meeting with the architect, interior designers, mechanical engineer, lighting designer, contractor, cost estimator and the end user to explore and resolve possible benefits and tradeoffs that increased glazing and access to views

Hold an integrated design meeting with the architect, interior designers, mechanical engineer, lighting designer, contractor, cost estimator and the end user to explore and resolve possible benefits and tradeoffs that increased glazing and access to views strategies could have on daylight, glare, heat gain and loss, furniture design and layout, and other design decisions.