Projects with district energy systems must commission, for the prerequisite, all “downstream” equipment—systems installed for the building’s use and included in the project costs.
Develop the Basis of Design (BOD), working with the design team, including at least the architect, mechanical, electrical and plumbing engineers with lighting designer.
Specify NRC of 0.70 for all ceiling tiles or a combination of ceiling and wall materials meets the 0.70 requirement for an area equal to the total ceiling area.