The owner, mechanical engineer and building operator should determine the best option for corrective action in the project. Options for corrective action include opening windows, adjusting air-handling units, alerting tenants, and increasing ventilation flow rates.
The project team and contractor work together to determine the feasibility and rough cost increase of including CO2 sensors or outdoor airflow measurement devices.
Continuous airflow and CO2 monitoring is required. Air balancing measures such as total airflow measurement and static pressurization measurements do not comply with the credit requirements.
Consider the impact of monitoring devices on space and design requirements. Issues to consider include the location of CO2 sensors, the inclusion of outdoor air monitors when designing the mechanical system, and whether to use a building management system (BMS), which allows your ventilation system to automatically respond to changing indoor situations.
Consider incorporating CO2 sensors or outdoor airflow monitors into the building design, as required by the credit. Discuss with the project team the indoor air quality (IAQ) and energy benefits of installing monitoring devices in the project.
Determine the best ventilation strategy for your building: natural, mechanical, or mixed-mode ventilation. The choice of ventilation system is more likely to be shaped by the LEED minimum ventilation prerequisite (IEQp1) and increased ventilation credit (IEQc2), not this credit.
If using porous paving, implement a plan to maintain its porosity. Vehicle use, sand and organic matter, and snowplowing can all damage or reduce the effectiveness of porous paving.
Implement a maintenance plan to ensure ongoing, as-designed performance of stormwater systems and equipment. Doing so will also contribute to LEED-EBOM SSc6 compliance.