Identify the urban lighting zone as defined by IESNA RP-33, based on the population density of the neighborhood, in order to establish lighting requirements.
Identify the building owner’s goals for occupant safety and comfort as well as for architectural lighting, including façade lighting. Include these goals in the Owners Project Requirements for EAp1: Fundamental Commissioning.
Designate one responsible party to oversee exterior lighting-related LEED credit requirements. For large projects, this person may be the civil engineer or landscape architect. For small projects it may be the architect, lighting designer, or other relevant team member.
Projects using stream protection to achieve the credit must provide a detailed narrative describing how the stormwater management plan protects the receiving waterway from erosion and keeps runoff below critical levels.
If post-development rate and quantity are not equal to or less than pre-development, the option exists for the civil engineer to design stormwater improvements to enable discharge channels from the site to the receiving stream channels to be protected from erosion. The stormwater management narrative must detail the strategies used and how they protect receiving stream channels from excessive erosion. In this plan the civil engineer verifies that post-development stormwater runoff is below critical values for the receiving waterway.