The contractor should communicate with all subcontractors about the recycling policy to make sure it is being followed. Recycling activities should be discussed regularly at job meetings.
Provide training for each contractor and subcontractor about the CWM plan and the importance of documenting it. Make sure everyone is on the same page regarding recycling goals. Make each training session specific to that trade.
Provide a deconstruction-detailed drawing and specification with specific handling instructions for each material to be removed, such as whether it will be salvaged and sold, reused onsite, or marked for recycling.
If separation is occurring off-site at a comingled or mixed-debris processing plant, make sure the processor or recycling facility can provide documentation for the amount of waste processed, by weight or by volume, as agreed, as well as a diversion rate from the facility. This could be either a project-specific diversion rate supplied by the facility, or a letter from the state regulating body with the facility's average rate of recycling.