LEED project managers should provide contractors with tracking or log-book forms to simplify the tracking process. See the Resources section for the LEEDuser CWM tracking calculator.
Maintain a project log to input all the monthly reports in one place. This will track project waste recycling rates and provide an alert if the average is lower than the target of 50% or 75%. Address these shortfalls early in the process to ensure that final diversion rates can be met.
If separation is occurring off-site at a mixed-debris processing plant, make sure the recycling facility can provide documentation for the amount of waste processed, by weight or by volume, as well as monthly recycling rate information, which is required for documentation purposes.
If separation is occurring off-site, make sure recyclables are not contaminated with other garbage and wet waste. Provide separate containers for food waste and miscellaneous garbage and mark all containers clearly and prominently.
The recycling coordinator tracks onsite waste recycling every month, or with every filled bin, to stay on track. The bins may fill at different times, depending on the material. Every time a bin is emptied and weighed, fill in the data on the tracking sheet.
Use signage to support the CWM plan—reminding subcontractors to sort waste appropriately. Post signs on the sorting bins, garbage cans, and throughout the site. Signs should include whatever languages are needed to communicate with workers on the jobsite.
Designate a separate area to place bins for recycling. If waste is commingled (for off-site separation by the recycling center), some additional space is still required to keep wet waste and other garbage apart from recyclables.