Schedule the installation of absorptive flooring systems so that they are protected from construction air contaminants. This is required if your project is pursuing IEQc3.1: Construction Indoor Air Quality Management Plan—During Construction. For example, carpet tiles installed before walls are painted will absorb VOCs from the paint, and then offgas over a longer period.
Credits:
Project phase:
Credit tip type: