Implement a quality control program to ensure that construction waste from facility alterations or additions is not mishandled. Perform periodic checks, and generate reports during the performance period to ensure that the target waste-diversion rate is being met and that the correct information is being collected for all waste leaving the site.
Credits:
Project phase:
Credit tip type: