Crosscheck that your no and low-cost measures list for EAc2.2 includes all measures identified under EAc2.1 and EAp1, as there needs to be consistency in these three areas.
Credits:
Project phase:
Credit tip type:
Crosscheck that your no and low-cost measures list for EAc2.2 includes all measures identified under EAc2.1 and EAp1, as there needs to be consistency in these three areas.