Our project has 85% of parking covered by the building, but on the roof we have a vegetated area and solar panels. In the credit of Heat Island Reduction can we opt for Option 1?

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Mar 5, 2025, 9:47 am

Heat Island with Solar Panels

NC-v4.1 SSc5:Heat Island Reduction
posted by  Anna Pooler  on 

Hello,

I'm working on a project that has a solar array covering the majority of the roof. Can we exempt the panels from the roof calculations for Heat Island Reduction?

1
Fri Oct 25, 2024, 4:39 am
1
Mon Sep 2, 2024, 6:35 pm

Heat Island Reduction - Non-roof measures

NC-v4.1 SSc5:Heat Island Reduction
posted by  Eslam Elshorbagy  on 

Hello, 

To meet the credit, I want to ask if the mechanical and equipment rooms shouldn't be included (excluded) in the roof area calculations. Thanks! Eslam

2
Sustainability Project Manager
The Sheward Partnership
LEEDuser Basic Member
0 thumbs up
Wed Oct 4, 2023, 12:19 am

Exclude common roads that serve multiple buildings?

NC-v4.1 SSc5:Heat Island Reduction
posted by  Maureen Drullard  on 

I am curious what folks make of this statement from the "step-by-step guidance" in the v4.1 Beta guide: "Common roads that serve multiple buildings should not be included in this calculation.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Sep 20, 2023, 5:11 pm

Can ground level landscape be classified as Nonroof Measures?

NC-v4.1 SSc5:Heat Island Reduction
posted by  Antonio Poblete  on 

Do areas with ground level landscape count towards any of the calculations? 

1
Wed Oct 4, 2023, 12:41 am

Heat Island SRI + Shade

NC-v4.1 SSc5:Heat Island Reduction
posted by  Cynthia Dehlavi  on 

A couple question about SS Credit Heat Island Reduction - Non Roof Measures:

1
Wed Oct 4, 2023, 12:24 am

Project changes

NC-v4.1 SSc5:Heat Island Reduction
posted by  Jordi Castellano  on 

I have a question regarding the changes that can occur between the design phase and the construction phase:

1
Fri Jun 30, 2023, 5:04 am

SSc6: Light Pollution Reduction - decomposed granite or local rock materials

NC-v4.1 SSc5:Heat Island Reduction
posted by  Kevin Gilleran  on 

Hi,

I have a client who will be crushing rock native to the local site (winery) for hardscape pathways as well as pathways on a vegetated roof.

1
Tue Oct 18, 2022, 4:20 pm

Artificial turf in Steep-sloped roof

NC-v4.1 SSc5:Heat Island Reduction
posted by  weam baljoon  on 

Can anyone clarify for NC-v4.1 SSc5 Option 1 Roof and Non-Roof - if Steep-sloped roof is covered with Artificial turf (decretive finish) and the product is within the minimum solar reflectance inde

1
Wed Oct 4, 2023, 12:17 am
5
Default Avatar
Sustainability/LEED Executive
co-energi (Pvt) Ltd.
LEEDuser Basic Member
7 thumbs up
Fri Aug 26, 2022, 12:50 pm

Concrete SR Test Didn't Pass

NC-v4.1 SSc5:Heat Island Reduction
posted by  Mike Bahr  on 

We are working on a large project with a significant amount of site paving.

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue Aug 23, 2022, 5:29 pm

Tennis court- Heat Island Reduction

NC-v4.1 SSc5:Heat Island Reduction
posted by  GABRIELA TREVINO  on 

We have a proyect that in the LEED boundary includes a tennis court. It's a clay court so it's not exacly paved.

1
Fri Jan 21, 2022, 5:35 am

SS-Heat Island Reduction (Parking Under Cover)

NC-v4.1 SSc5:Heat Island Reduction
posted by  Ken Gallegos  on 

On a fire station project, does the apparatus bay count in the Parking Under Cover area?

1
Fri Aug 14, 2020, 6:02 pm

Site Area Question

NC-v4.1 SSc5:Heat Island Reduction
posted by  Catherine Blakemore  on 

I noticed in the LEEDuser commentary that the credit calculations need to include parking outside the LEED project boundary.  Does this addition area get added to the area to of the LE

1
Tue Feb 11, 2020, 6:34 pm

Area of Nonroof Measures

NC-v4.1 SSc5:Heat Island Reduction
posted by  Yannick Fluck  on 

"Provide shade with architectural devices or structures":

Does this include the facade of an architectural building?

1
Mon Jul 8, 2019, 6:47 pm

Boubts about the SSc5 Credit Island Reduction

NC-v4.1 SSc5:Heat Island Reduction
posted by  Maria Peralta  on 

I am wirting to enquire about a project wich I am carryng out.

The doubt is about the credit (SSc5) "Heat Island reduction".