LEED v4
Existing Hospitality
Energy and Atmosphere
Existing building commissioning—analysis

Hospitality-EBOM-v4 EAc1: Existing building commissioning—analysis

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Evaluate the current performance of the project building against the performance specifications in the current facilities requirements and the operations and maintenance plan. Identify the systems and components in the facility to be investigated and analyzed as part of the existing building commissioning or energy auditing process. Provide a breakdown of estimated resource use for each of these systems.
Option 1. Existing building commissioning
Develop an existing building commissioning plan to effectively inventory and evaluate specific opportunities within the systems being analyzed. The commissioning plan must include the following:
  • updated current facilities requirements;
  • the commissioning team members and their roles and responsibilities during the commissioning process;
  • a description of the approach for identifying and analyzing facility improvement opportunities;
  • the process for reviewing and prioritizing identified opportunities with the owner and developing an implementation plan;
  • the format and content of the eventual deliverables from the commissioning process; and
  • the proposed schedule.
Option 2. Energy audit
Develop an energy audit plan following the requirements of ASHRAE Level 2, Energy Survey and Analysis, to evaluate efficiency opportunities. [Europe ACP: EN 16247] The audit plan must include the following:
  • the audit team members and their roles and responsibilities during the audit process;
  • a description of the approach for identifying and analyzing facility improvement opportunities;
  • the process for reviewing and prioritizing identified opportunities with the owner and developing an implementation plan;
  • the format and content of the eventual deliverables from the audit process; and
  • the proposed schedule.

Performance

Apply the requirements below to all direct energy-consuming or energy-producing systems, including lighting, process loads, HVAC&R, domestic water heating, and renewable energy. Update the systems and components to be addressed as part of the existing building commissioning or energy auditing process. Provide a breakdown of estimated resource use for each of these systems.
Option 1. Existing building commissioning
Update and execute the existing building commissioning plan.
Option 2. Energy audit
Update and execute the energy audit plan following the requirements of ASHRAE Level 2, Energy Survey and Analysis. [Europe ACP: EN 16247] For each opportunity, describe the potential improvement, estimated implementation costs, and anticipated savings.

Alternative Compliance Paths (ACPs)

Europe ACP: EN 16247
Projects in Europe may use the energy audit procedure defined in EN 16247-2:2014 with a level of detail consistent with the scope of the credit. See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

27/01/2017– Updated: 27/01/2017
Reference Guide Correction
Description of change:
100002133

Under "Group Approach", replace the sentence "All buildings in the group may be documented as one. If so, each building in the group must use the same compliance
option to meet the credit requirements." with the following text: "Documentation may be combined provided it addresses each building individually. Each building in the group must use the same compliance option to meet the credit requirements."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »
Guest expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Evaluate the current performance of the project building against the performance specifications in the current facilities requirements and the operations and maintenance plan. Identify the systems and components in the facility to be investigated and analyzed as part of the existing building commissioning or energy auditing process. Provide a breakdown of estimated resource use for each of these systems.
Option 1. Existing building commissioning
Develop an existing building commissioning plan to effectively inventory and evaluate specific opportunities within the systems being analyzed. The commissioning plan must include the following:
  • updated current facilities requirements;
  • the commissioning team members and their roles and responsibilities during the commissioning process;
  • a description of the approach for identifying and analyzing facility improvement opportunities;
  • the process for reviewing and prioritizing identified opportunities with the owner and developing an implementation plan;
  • the format and content of the eventual deliverables from the commissioning process; and
  • the proposed schedule.
Option 2. Energy audit
Develop an energy audit plan following the requirements of ASHRAE Level 2, Energy Survey and Analysis, to evaluate efficiency opportunities. [Europe ACP: EN 16247] The audit plan must include the following:
  • the audit team members and their roles and responsibilities during the audit process;
  • a description of the approach for identifying and analyzing facility improvement opportunities;
  • the process for reviewing and prioritizing identified opportunities with the owner and developing an implementation plan;
  • the format and content of the eventual deliverables from the audit process; and
  • the proposed schedule.

Performance

Apply the requirements below to all direct energy-consuming or energy-producing systems, including lighting, process loads, HVAC&R, domestic water heating, and renewable energy. Update the systems and components to be addressed as part of the existing building commissioning or energy auditing process. Provide a breakdown of estimated resource use for each of these systems.
Option 1. Existing building commissioning
Update and execute the existing building commissioning plan.
Option 2. Energy audit
Update and execute the energy audit plan following the requirements of ASHRAE Level 2, Energy Survey and Analysis. [Europe ACP: EN 16247] For each opportunity, describe the potential improvement, estimated implementation costs, and anticipated savings.

Alternative Compliance Paths (ACPs)

Europe ACP: EN 16247
Projects in Europe may use the energy audit procedure defined in EN 16247-2:2014 with a level of detail consistent with the scope of the credit. See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

27/01/2017– Updated: 27/01/2017
Reference Guide Correction
Description of change:
100002133

Under "Group Approach", replace the sentence "All buildings in the group may be documented as one. If so, each building in the group must use the same compliance
option to meet the credit requirements." with the following text: "Documentation may be combined provided it addresses each building individually. Each building in the group must use the same compliance option to meet the credit requirements."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »
Guest expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate