Energy and Atmosphere
Energy efficient best management practices

LEED CREDIT

Schools-EBOM-v4 EAp1: Energy Efficiency Best Management Practices Required

See all forum discussions about this credit »
View the LEED v4.1 version of this credit »

SPECIAL REPORT

LEEDuser expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

SPECIAL REPORT

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Conduct an energy audit that meets both the requirements of the ASHRAE preliminary energy use analysis and an ASHRAE Level 1 walk-through assessment identified in the ASHRAE Procedures for Commercial Building Energy Audits or equivalent. [Europe ACP: EN 16247] Prepare and maintain a current facilities requirements and operations and maintenance plan that contains the information necessary to operate the building efficiently. The plan must include the following:
  • a current sequence of operations for the building
  • the building occupancy schedule;
  • equipment run-time schedules;
  • setpoints for all HVAC equipment;
  • setpoints for lighting levels throughout the building;
  • minimum outside air requirements;
  • any changes in schedules or setpoints for different seasons, days of the week, and times of day;
  • a systems narrative describing the mechanical and electrical systems and equipment in the building; and
  • a preventive maintenance plan for building equipment described in the systems narrative.

Performance

None.

Alternative Compliance Paths (ACPs)

Europe ACP: EN 16247
Projects in Europe may use the energy audit procedure defined in EN 16247-2:2014. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Frequently asked questions

Does the ASHRAE Level I audit have to be completed within the two-year performance period for an initial certification?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

4/6/2018Updated: 4/6/2018
Reference Guide Correction
Description of change:
EA prerequisite Energy Efficiency Best Management Practices:
Step-by-Step section> Step 7: Delete third bullet point: "energy use breakdown by major system types or end uses"
Further Explanation > Energy Use Analysis: Delete 5th and 6th paragraphs from this section. The 5th paragraph begins "Determine the appropriate breakdown of energy use..." and the 6th paragraph begins "Use engineering calculations..."

EA prerequisite Minimum Energy Performance: - Further Explanation > Improving Performance: Delete the phrase "based on the breakdown of energy consumption by end-use category" from the end of the sentence that begins "Use the results of the energy audit..." in the second paragraph.
Campus Applicable
No
Internationally Applicable:
No
1/27/2017Updated: 1/27/2017
Reference Guide Correction
Description of change:
Under "Group Approach", replace the sentence "All buildings in the group may be documented as one" with the following text: "Documentation may be combined provided it addresses each building individually. The ASHRAE Level I Walk‐Through Analysis report must include a summary of results for each individual building."
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Conduct an energy audit that meets both the requirements of the ASHRAE preliminary energy use analysis and an ASHRAE Level 1 walk-through assessment identified in the ASHRAE Procedures for Commercial Building Energy Audits or equivalent. [Europe ACP: EN 16247] Prepare and maintain a current facilities requirements and operations and maintenance plan that contains the information necessary to operate the building efficiently. The plan must include the following:
  • a current sequence of operations for the building
  • the building occupancy schedule;
  • equipment run-time schedules;
  • setpoints for all HVAC equipment;
  • setpoints for lighting levels throughout the building;
  • minimum outside air requirements;
  • any changes in schedules or setpoints for different seasons, days of the week, and times of day;
  • a systems narrative describing the mechanical and electrical systems and equipment in the building; and
  • a preventive maintenance plan for building equipment described in the systems narrative.

Performance

None.

Alternative Compliance Paths (ACPs)

Europe ACP: EN 16247
Projects in Europe may use the energy audit procedure defined in EN 16247-2:2014.

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.

Does the ASHRAE Level I audit have to be completed within the two-year performance period for an initial certification?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

4/6/2018Updated: 4/6/2018
Reference Guide Correction
Description of change:
EA prerequisite Energy Efficiency Best Management Practices:
Step-by-Step section> Step 7: Delete third bullet point: "energy use breakdown by major system types or end uses"
Further Explanation > Energy Use Analysis: Delete 5th and 6th paragraphs from this section. The 5th paragraph begins "Determine the appropriate breakdown of energy use..." and the 6th paragraph begins "Use engineering calculations..."

EA prerequisite Minimum Energy Performance: - Further Explanation > Improving Performance: Delete the phrase "based on the breakdown of energy consumption by end-use category" from the end of the sentence that begins "Use the results of the energy audit..." in the second paragraph.
Campus Applicable
No
Internationally Applicable:
No
1/27/2017Updated: 1/27/2017
Reference Guide Correction
Description of change:
Under "Group Approach", replace the sentence "All buildings in the group may be documented as one" with the following text: "Documentation may be combined provided it addresses each building individually. The ASHRAE Level I Walk‐Through Analysis report must include a summary of results for each individual building."
Campus Applicable
No
Internationally Applicable:
Yes

LEEDuser expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Schools-EBOM-v4 EAp1 View the LEED v4.1 version of this credit