Schools-2009 MRc5: Regional Materials
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within a specified distance of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) must contribute to the regional value. The minimum percentage regional materials for each point threshold is as follows:
See all forum discussions about this credit »Frequently asked questions
What if different parts of a product are manufactured at different locations?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What is the purpose of the newly added Option 2? Can I pursue both options?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
How do we account for materials using the new Option 2 equation?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
With steel and aluminum products, why do I often get review comments questioning why my extraction distance is the same as my manufacture distance?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Why can’t I include mechanical, electrical and plumbing components in this credit? What if I consistently include MEP materials in the calculations for all of the MR credits I’m attempting?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
We are pursuing IEQc4.5 as an ID credit. Are we thus required to include the cost of furniture in MRc3–7?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within a specified distance of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) must contribute to the regional value. The minimum percentage regional materials for each point threshold is as follows:
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Frequently asked questions
What if different parts of a product are manufactured at different locations?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What is the purpose of the newly added Option 2? Can I pursue both options?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
How do we account for materials using the new Option 2 equation?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
With steel and aluminum products, why do I often get review comments questioning why my extraction distance is the same as my manufacture distance?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Why can’t I include mechanical, electrical and plumbing components in this credit? What if I consistently include MEP materials in the calculations for all of the MR credits I’m attempting?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
We are pursuing IEQc4.5 as an ID credit. Are we thus required to include the cost of furniture in MRc3–7?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |