Log in
v2009 LEED v2009
CS-2009Core & Shell Core & Shell
MPRMinimum Program Requirements Minimum Program Requirements
MPR5Must comply with minimum occupancy rates Must comply with minimum occupancy rates

LEED CREDIT

CS-2009 MPR5: Must comply with minimum occupancy rates Required

See all forum discussions about this credit »

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

New Construction, Core & Shell, Schools, Commercial Interiors, Retail – New Construction, Retail – Commercial Interiors, Healthcare

Full Time Equivalent Occupancy
The LEED project must serve 1 or more Full Time Equivalent (FTE) occupant(s), calculated as an annual average in order to use LEED in its entirety. If the project serves less than 1 annualized FTE, optional credits from the Indoor Environmental Quality category may not be earned (the prerequisites must still be earned).

 

Existing Buildings: O&M

Full Time Equivalent Occupancy
The LEED project must serve 1 or more Full Time Equivalent (FTE) occupant(s), calculated as an annual average in order to use LEED in its entirety. If the project serves less than 1 annualized FTE, optional credits from the Indoor Environmental Quality category may not be earned (the prerequisites must still be earned).

 

Minimum Occupancy Rate
The LEED project must be in a state of typical physical occupancy, and all building systems must be operating at a capacity necessary to serve the current occupants, for a period that includes all performance periods as well as at least the 12 continuous months immediately preceding the first submission for a review.

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Addenda

10/1/2012
LEED Interpretation
Inquiry:

A campus group project contains a fully occupied office and an associated support building larger than 1,000 sf, that is occupied, but whose occupancy calculated as an annual average, does not equal 1 FTE. Are both buildings able to peruse certification and would they both be eligible for IEQ credits in the LEED rating systems?

Ruling:

Buildings are able to pursue IEQ credits through group certification following the LEED Application Guide for Multiple Buildings and On-Campus Building Projects Guidance if both buildings are regularly occupied and the aggregate annual average FTE of a fully occupied building and its associated support building is greater than 1, as required in MPR #5. In implementing this aggregate approach for MPR #5, both buildings should meet all other MPR requirements. As required with group certification, both buildings would be able to pursue all eligible IEQ credits, but must document credit compliance for all buildings included within the group

Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

New Construction, Core & Shell, Schools, Commercial Interiors, Retail – New Construction, Retail – Commercial Interiors, Healthcare

Full Time Equivalent Occupancy
The LEED project must serve 1 or more Full Time Equivalent (FTE) occupant(s), calculated as an annual average in order to use LEED in its entirety. If the project serves less than 1 annualized FTE, optional credits from the Indoor Environmental Quality category may not be earned (the prerequisites must still be earned).

 

Existing Buildings: O&M

Full Time Equivalent Occupancy
The LEED project must serve 1 or more Full Time Equivalent (FTE) occupant(s), calculated as an annual average in order to use LEED in its entirety. If the project serves less than 1 annualized FTE, optional credits from the Indoor Environmental Quality category may not be earned (the prerequisites must still be earned).

 

Minimum Occupancy Rate
The LEED project must be in a state of typical physical occupancy, and all building systems must be operating at a capacity necessary to serve the current occupants, for a period that includes all performance periods as well as at least the 12 continuous months immediately preceding the first submission for a review.

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about CS-2009 MPR5