Plan to include an area for recycling storage. The architect needs to allocate this space and include it on project drawings. (See the Documentation Toolkit for a sample floorplan.)
Contract with the M&V provider early in the process so that system components and recommendations can be implemented seamlessly into systems rather than becoming add-ons.
The “M&V provider” develops M&V plan. This role can be filled by the commissioning agent, energy modeler, mechanical engineer, project engineer, or a facilities manager.
Consider the impact of an M&V program on mechanical system design requirements. Consider whether or not your mechanical system is capable of providing the necessary outputs for the BMS or monitoring system. The outputs are typically the energy usage recorded as kWh, Btus or therms for a given period of time.
Consider incorporating a Building Management System (BMS) into the building. While not required, a BMS will streamline implementation of this credit and will likely be more cost-effective for larger buildings. A BMS will also offer long-term benefits during operations & maintenance.
Many smaller fixtures may make for a better layout than fewer high-wattage ones. The designer should be able to advise about additional infrastructure costs associated with an atypical lighting design. Low power