Consider the impact of an M&V program on mechanical system design requirements. Consider whether or not your mechanical system is capable of providing the necessary outputs for the BMS or monitoring system. The outputs are typically the energy usage recorded as kWh, Btus or therms for a given period of time. It may be an automated record kept by the BMS, or a metered reading on the equipment manually carried out at regular intervals. The specifics of the output metric and duration would be determined in the M&V plan and depend on the system installed.