Consider implementing a strategy from another LEED rating system that is not included in the LEED-CI rating system, such as LEED-NC SSc5.2: Maximize Open Space. The LEED Reference Guide contains a list of credits from other LEED rating systems that are pre-approved for use under this path. In most cases, no special conditions apply, but with some of the energy credits from the LEED-
If the onsite renewable energysystem generates 10% of the annual building energy cost, one point can be earned under SSc1, Option 2, Path 12: Other Quantifiable Environmental Performance.
Identify energy sources that make the most sense given your project’s geographical location and climate zone and, if possible, work with the building to install appropriate renewable energy sources onsite—usually photovoltaic panels on the roof.
Select a building that has an onsite renewable energy system that can produce at least 2.5% of the building’s (not just the tenant space’s) total electricity or thermal energy needs. These include: