Develop an operations manual with input from the design team in collaboration with facility management and commissioning agent if pursuing EAc3: Enhanced Commissioning.
The first year of operations is usually a learning period for both the occupants and the facility manager. If your project underwent enhanced commissioning and developed an operations manual, you will have fewer miscommunications and untrained staff.
Energy-efficiency measures with a higher first cost often provide large savings in energy use and operational energy bills. These credit requirements are directly tied to the benefits of efficient, low-cost operations.
Some energy efficiency features may require special training for operations and maintenance personnel. For example, cogeneration and building automation systems require commissioning and operator training.
The benefit of designing for energy efficiency is realized only during operations and maintenance. Record energy use to confirm that your project is saving energy as anticipated. If you are not pursuing EAc5: Measurement and Verification, you can implement tracking procedures such as reviewing monthly energy bills or on-the-spot metering.
Develop an operations manual with input from the design team in collaboration with facility management and commissioning agent if pursuing EAc3: Enhanced Commissioning.
Although not required for credit compliance, developing a plan to monitor the performance of lighting control systems is recommended. This may include occupant survey feedback (EQc7.2), ongoing monitoring (EAc5), and a schedule for regular testing of components.
The strategies required by EQc5: Indoor Chemical Pollutant Source Control are intended to help buildings minimize sources of indoor air contamination during continued building operation. Pursuing EQc5 can help enhance the effects of building flushout or testing.